Monroe sits on the Skykomish, with the fairgrounds on the edge of town. River-bottom ground stays wet, and a yard built as if the water table were low will heave, puddle, or grow moss until someone deals with the water. Armoring the river is not a backyard rockery. We build walls for your grade. We do not push fill into the channel.
Snohomish County · ZIP 98272 · 2020 population 19,608
Rock for the bank by the house, not a river dike
Up at the house, a rock wall takes up the slope between the yard and the path. It is drained, battered, and founded below the soft organic soil river lots hide under the grass. Down at the ordinary high water, we stop.
If floodwater has undercut a small bank away from the channel, we can rebuild that with stone and plant it. We look at where the water wants to go before we close anything off.
The ground in Monroe
We see two kinds of lots. In town, smaller yards with the usual compacted soil and a lawn that has to look fine for most of the year. Closer to the river and the low ground, soils that remember high water. Gravel and drains belong there. A finished bark bed in a spot that floods is mulch in the neighbor’s fence line by spring.
The fair is part of the calendar. People want yards cleaned up and hedges cut back before the traffic and the guests, and they want storm debris gone after the first big fall wind. Trees on these lots — including the old fruit trees — need pruning that opens them up, not a topping that makes them dangerous. Native plantings along the wet edges do the work a lawn cannot.
How we do the work
A rock wall is dry-stacked or lightly set, with the weight in the stone and the drainage in the voids. It is not a veneer glued to a failing timber wall. We use rock big enough for the height, with a face that leans back into the hill, and smaller rock locked behind so the soil does not pipe through.
Good rock work looks heavier at the bottom. If every stone is the same patio-sized block, it is not a wall, it is a stack. We source local stone and we will tell you when the access cannot take the boulder the job wants.
What we look at first
- Height and whether it is structural or a garden edge
- Machine access for real boulders
- The soil behind: clay that needs a drain, or rock that already sheds
- An existing wall we are tying into
Dry stack versus mortared
Most of our rock walls are dry, so water can leave and the wall can move a little without cracking a joint. Mortar is for a low, formal edge that is not holding a wet hill. We do not mortar a drainage problem shut.
Tying into old rockery
We can often continue an existing rockery if the old base is still honest. If the old wall is tipping, we take it down and use the good stone again. Matching a lean is how you extend a failure.
The base course
The biggest stones, buried, on compacted rock or competent ground. If the first course is the one you can see sitting on the grass, the wall is already failing. You should see the second course at grade, not the bottom of the first.
More from this crew
- Rock walls across Snohomish County
- Retaining walls in Monroe
- Gravel installation in Monroe
- Landscaping in Monroe
- Hardscaping in Monroe
- Rock walls in Sultan
- Rock walls in Snohomish
- Rock walls in Gold Bar
Sources for the climate and the water
- USDA plant hardiness map for choosing plants that can take a Snohomish County winter.
- EPA WaterSense on watering less once a lawn or a new planting is established.
- EPA Soak Up the Rain on keeping roof and yard water from becoming someone else’s problem.



